• Custom shape feasibility
  • Drawing and liner review
  • Prototype acceptance planning

Qualify a replacement or second patch cutting die

A second die can help schedule work or replace a worn tool. Each die still needs its own identity and samples that show how its output compares with the approved part. This matters when mixed shipments may contain pieces from both tools.

Separate tool history from part revision

Give the second die a distinct tool identifier even when it uses the same part revision. Record the material and carrier used for its trial. Ask the supplier to identify the cavity or position for each sample and include a matched set from the original die when available. Compare like orientations on the same surface to avoid confusing a flipped profile with a tooling difference.

Decide how to approve the second tool

Select the critical areas from the approved drawing, such as a narrow neck, a protected edge or a liner slit. Record measurements and handling observations by tool. If a difference appears only at one position, retain that position reference for follow-up. Release the additional tool after the named reviewer accepts the comparison and update purchasing records with both allowable identifiers.

Frequently asked questions

Should a replacement die receive a new part number?

The buyer can retain the part number if its specification stays the same. The tooling and approval records should identify the replacement.

References

Share this requirement with our team

Share the proposed outline, target areas, drawing revision and any prototype acceptance criteria.