• Custom shape feasibility
  • Drawing and liner review
  • Prototype acceptance planning

Plan a patch cutting-die handover

The price of a die does not tell a purchasing team who will store it, when it can be moved or which material stack it was approved for. Put those questions into the tooling brief before a supplier begins work.

Identify the physical tool

Ask for the identifier stamped on the die, the drawing revision it serves and the equipment interface assumed in the quote. List any plates, guides or fixtures that belong with it. If two sizes share a product name, use distinct identifiers for each size. Request a picture of the tool identification and a drawing reference that can be matched to the approved sample.

Agree what goes with a transfer

Record who authorizes release, who arranges transport and how the receiving converter will confirm compatibility. Include storage conditions proposed by the toolmaker, condition at handover and responsibility for any repair assessment. Keep a retained part from the last approved run so the receiving team has a physical comparison. Have the parties record the agreed commercial terms with the purchase documents.

Frequently asked questions

Will the same die run at another supplier?

The receiving supplier needs to check its equipment, fixtures and intended material stack before committing to a trial.

References

Share this requirement with our team

Share the proposed outline, target areas, drawing revision and any prototype acceptance criteria.